Solutions for the building envelope
Installation of high-performance waterproofing systems to manufacturer specifications — for builders who know getting it right the first time is always cheaper than fixing it later.
Properly installed enclosure systems that manage bulk water, vapor, and air movement — protecting the structure from the outside in.
See barrier work →The most overlooked detail in any build. Every opening is treated as a potential failure point — because that’s exactly what it is if it’s not done right.
See opening work →Including over occupied space. High-performance coating systems installed with the prep and precision required to protect both the structure and the people below.
See balcony work →Foundation walls, elevator pits, and planter boxes — places that stay wet and can’t be reached once they’re backfilled, filled, or finished. Done right before it’s buried.
Ask about below-grade work →Building Science Group LLC specializes in air and water barriers, rough opening waterproofing, high-end balcony coating systems, and below-grade waterproofing — including elevator pits and planter boxes.
Equipped with the best materials and methods in the industry, so every project gets waterproofing that actually performs. Your build becomes the mission — and it doesn’t get handed off until it’s done right.
Prep is the most important — and most overlooked — part of waterproofing. Every system starts there.
Every system is installed to the manufacturer’s requirements and the project documents — same crew, same standards, start to finish.
Not the right fit for every job, by design. The work is for builders who care about long-term performance — not just getting past inspection.
Built for builders who value precision. Send over the project details and expect a prompt follow-up.